Area/Topic  |  Bibliography   |  Background   |  Hypotheses   |  Home


 
 

KRIS E. Marin Sonoma: Picture Page

Area Arroyo Corte Madera
Topic Tour: Monitoring Arroyo Corte Madera del Presidio Lower 1996
 

peri_acmdp_2a_sm.jpg 68K  Click on image to enlarge (68K).  Click here to display a larger version (318K).

This picture was taken in Arroyo Corte Madera del Presidio at Reach 2A, which is near the footbridge downstream of La Goma Road, on July 3, 1996. Note the trapezoidal channel. The California Conservation Corps occasionally conducts non-native vegetation removal at this site. This is one of the only areas in the watershed with low hanging vegetation. Photo provided by Andy Peri.


peri_acmdp_2b_sm.jpg 71K  Click on image to enlarge (71K).  Click here to display a larger version (333K).

This picture was taken in Arroyo Corte Madera del Presidio at Reach 2B, which is upstream of the Locust Bridge, on July 11, 1996. Note the retaining walls and new house under construction on the right bank. Photo provided by Andy Peri.


peri_acmdp_2c_sm.jpg 89K  Click on image to enlarge (89K).  Click here to display a larger version (383K).

This picture was taken in Arroyo Corte Madera del Presidio at Reach 2C on July 24, 1996. Note the retaining walls along the creek. During this survey an adjacent landowner indicated the streambank on the west side of the creek has severely eroded over the years. Photo provided by Andy Peri.


peri_acmdp_3a_sm.jpg 56K  Click on image to enlarge (56K).  Click here to display a larger version (263K).

This picture was taken in Arroyo Corte Madera del Presidio at Reach 3A, which is downstream of the Park Street Bridge, on August 7, 1996. The pool in the foreground is approximately 7 feet deep. Photo provided by Andy Peri.


peri_acmdp_3b_sm.jpg 99K  Click on image to enlarge (99K).  Click here to display a larger version (440K).

This picture was taken in Arroyo Corte Madera del Presidio at Reach 3B, which is upstream of the Park Street Bridge, on October 1, 1996. Photo provided by Andy Peri.


peri_acmdp_3c_sm.jpg 109K  Click on image to enlarge (109K).  Click here to display a larger version (484K).

This picture was taken in Arroyo Corte Madera del Presidio at Reach 3C, which is upstream of the Mill Valley Lumber Company, on October 25, 1996. Photo provided by Andy Peri.


peri_acmdp_4a_sm.jpg 72K  Click on image to enlarge (72K).  Click here to display a larger version (351K).

This picture was taken in Arroyo Corte Madera del Presidio at Reach 4A on August 23, 1996. Photo provided by Andy Peri.


peri_acmdp_4a2_sm.jpg 99K  Click on image to enlarge (99K).  Click here to display a larger version (469K).

This picture was also taken in Arroyo Corte Madera del Presidio at Reach 4A on August 23, 1996. Note the bank armoring and close proximity of the apartment building to the creek. Photo provided by Andy Peri.




To learn more about this topic click Info Links
To view additional information (data source, aquisition date etc.) about this page, click Metadata
 
 
  www.krisweb.com