Area/Topic  |  Bibliography   |  Background   |  Home


 
 

KRIS Klamath : Chart Page

Area Mainstem Trinity
Topic Flow: Trinity @ Steel Bridge Exceedance Curve
 
Caption:  The flow duration curve for the Trinity River at Steel Bridge, between Lewiston and Douglas City, only reflects flows after construction of the Trinity Project. The flow has exceeded 2580 cfs only 5% of the time since dam construction, but the river flow only dropped below 300 cfs 5% of the time. Pre-dam low flow conditions dropped below 100 cfs before dam construction in dry years.


To learn more about this topic click Info Links .
To view additional information (data source, aquisition date etc.) about this page, click Metadata .
To view the table with the chart's data, click Chart Table web page.
To download the table with the chart's data, click fdcstbr.dbf (size 1,378 bytes) .
 
 
  www.krisweb.com