Click on image to enlarge (20K). Bell Gulch Feather Edge project during construction just after berm removal. Photo taken from the top of the project looking downstream. 7/28/93
Bell Gulch Feather Edge project at the end of the construction phase. Photo taken from the top of the project looking downstream. 7/93
Bucktail Feather Edge project before construction. Photographed from bench mark looking downstream. 5/93.
Bucktail Feather Edge after construction in photo taken from bench mark looking downstream. 9/93.
Bucktail Feather Edge after construction looking at cobble substrate and quite edge water optimal for juvenile salmonids. 9/93
504Bucktail Feather Edge project with flow and velocity measurements being taken during 1500 cfs flows. April 1994