KRIS Klamath : Picture Page

Area Mainstem Trinity
Topic Tour: Restoration Side Channel Cemetery
 

tr2013.jpg 24K  Click on image to enlarge (24K).

Cemetery Side Channel just after construction in Spring 1989 with a run and high gradient riffle. Photos provided by the U.S. Fish and Wildlife Service.


tr2014.jpg 26K  Click on image to enlarge (26K).

Cemetery Side Channel inlet. Photo taken in June 1989. Photos provided by the U.S. Fish and Wildlife Service.


tr2017.jpg 24K  Click on image to enlarge (24K).

Recently constructed Cemetery Side Channel photographed from Goose Ranch Road in March 1989. Note the lack of cover and compare with photos later in this slide series. Photos provided by the U.S. Fish and Wildlife Service.


tr2022.jpg 30K  Click on image to enlarge (30K).

Cemetery Side Channel at 300 cfs flows during June of 1991 after high flows of 3000 cfs carried out as part of the U.S. Fish and Wildlife Service Flow Study.


tr2021.jpg 29K  Click on image to enlarge (29K).

Cemetery Side Channel at 300 cfs after 3000 cfs flows for study purposes. June 1991. Photos provided by the U.S. Fish and Wildlife Service.


tr2020.jpg 28K  Click on image to enlarge (28K).

Cemetery Side Channel in June 1991 with flows of 300 cfs after 3000 cfs. Photos provided by the U.S. Fish and Wildlife Service.


tr2018.jpg 32K  Click on image to enlarge (32K).

Willow plantings in March 1990 have helped improve cover and shade in the Cemetery Side Channel (see photo #8 in this series for improvements). Photos provided by the U.S. Fish and Wildlife Service.


tr2023.jpg 26K  Click on image to enlarge (26K).

Cemetery Side Channel with improved riparian four years after willow planting in September 1993. Photos provided by the U.S. Fish and Wildlife Service.